The system includes a computerised loading system, mesh belt controlled atmosphere hardening furnace, oil quench system, mesh belt tempering furnace, pre and post wash systems and Can-Eng’s PET™ System. By integrating Can-Eng’s PET™ System, Metex has access to vital tracking of their products’ status, detailed process data for continuous process improvements, comprehensive equipment diagnostics, cost analysis, inventory management, supervisory control and data acquisition (SCADA) enhanced features to support compliance with CQI-9 guidelines. This recent furnace design integrates enhancements to the radiant heating system that provides Metex with added capacity within a fixed system footprint.
This contract will represent Metex Heat Treating’s 6th Can-Eng furnace system, providing Metex with over 400,000 lbs./day of continuous atmosphere processing capacity in addition to batch and induction services, which are provided to customers across Canada and USA.
Metex selected Can-Eng to provide this additional equipment capacity as a result of the continuous improvements integrated into their systems, allowing them to meet the ever-increasing demands of the automotive industry.
BENTELER Gruppe sichert Finanzierung langfristig
Die BENTELER Gruppe hat ihre Finanzierung für die kommenden Jahre gesichert: Das Unternehmen platzierte bei institutionellen Investoren eine besicherte Anleihe in Höhe von 600 Mio. Euro. Die Anleihe war mehrfach überzeichnet, sie läuft bis 2031.