The furnace can reheat special steel blooms in sections between 185 and 240 mm square. Its state-of-the-art technology will ensure low levels of fuel consumption, scale formation and decarburization also after the modification, helping Sidenor to consolidate its benchmark position in SBQ production.
SMS group’s range of supply for the upgrade will include new steel structures with a set of SMS ZeroFlame extra-low NOX burners, which had already been included in stage 1 providing pollutant emissions of less than 100 mg/Nm3 at 1,250 °C, meeting the most stringent of European guidelines.
Since 1997, SMS group has installed 90 reheating furnaces for billets, blooms, slabs and pipes.
(Source: SMS group)
ANDRITZ receives final acceptance for pickling line and acid regeneration plant at voestalpine, Austria
International technology group ANDRITZ has successfully completed the supply of a continuous pickling line, acid regeneration plant, acid purification plant, and silicon removal systems to voestalpine in Linz, Austria.