The 1990s-era CCM currently is a production bottleneck for the plant, with a maximum casting capacity of 72,000 t/month.
The turkey project will include:
- New PLC and SCADA systems
- Converting 18 motors/drives from DC to AC power supply
- Complete replacement of Level 2 with Danieli Automation Q-CAST, including the Q-ART, Q-CUT, Q-MIX and Q-COOL technological packages.
With less than six months from the order to the restart of the plant, and only two weeks of shut down, this project represents an important challenge for Danieli Automation.